
Concrete Pad Contractor in Greenville, SC
Ace Concrete Construction pours concrete pads across Greenville and the Upstate. AC and generator pads, hot tub and shed pads, dumpster and equipment pads, all sized to the load and set level by our own crews. Free estimates.
- SC licence RBS.65343
- 20+ years in the trade
- Free on-site estimates
- Open Mon–Sun 7am–7pm
Fast & Free
Get Your Free Concrete Estimate

What thickness your pad needs
| Pad use | Typical thickness | How we reinforce it |
|---|---|---|
| AC condenser, small shed | 4 inches | Wire mesh, compacted base |
| Hot tub, generator, playset | 5–6 inches | Rebar, thickened edge, level surround |
| Dumpster, equipment, commercial | 6 inches or more | Rebar grid, engineered base |
Use these as a starting point. The pad we spec for your site depends on the load and the ground it sits on, which is what we confirm at the free estimate.
Concrete pad questions we hear in Greenville
For a home AC condenser or a standby generator, the pad only needs to be a little larger than the unit’s footprint, but it has to be level and stable so the equipment sits true and drains away from itself. We size it to your unit and set it on a compacted base so it does not settle or tip over time.
Yes. A spa or hot tub pad carries a lot of concentrated weight once it is full, so we pour it thicker than a standard patio slab and reinforce it to take the load without cracking. We set it level and slope the surround so water runs off.
We do. Dumpster enclosures, loading pads, and equipment bases take heavy, repeated loads, so they get a thicker pour, a rebar grid, and a proper base. That is commercial work for us alongside our commercial concrete service.
A light-duty pad for a shed or an AC unit is usually four inches. A pad carrying a hot tub, a generator, or equipment gets five to six inches with reinforcement. The right number comes from what sits on it, which we confirm on-site.
Some pads need a permit and some do not, depending on size, location, and what they support. We have poured enough of them around Greenville County to tell you what your project needs. Call 864-214-5271 and we will walk you through it.
Request a free estimate online or call us. We come out, measure, check the access and the base, and give you a real price and timeline.
Written and reviewed by Azriel Woodard, of Ace Concrete Construction (SC residential builder licence RBS.65343), and a member listing in the Home Builders Association of Greenville directory. Crews are in-house and estimates are free.

Pads we pour around the Upstate
- Step : 01
AC & generator pads
Level, stable bases for condensers and standby generators, sized to the unit and sloped to drain.
- Step : 02
Hot tub & spa pads
Poured thicker and reinforced to carry a full spa, with a level surround that sheds water.
- Step : 03
Shed & storage pads
A solid footprint for a shed, playset, or storage building that keeps it off the dirt and out of the mud.
- Step : 04
Dumpster & equipment pads
Heavy-duty pads for businesses, built to take repeated loads. Part of our commercial concrete work.
How we pour a pad that stays put
A pad lives or dies on two things: the base under it and the reinforcement inside it. We do not skip either.
- Step : 01
Size it to the load
An AC condenser and a loaded dumpster are not the same job. We match the footprint, the thickness, and the reinforcement to what the pad actually carries, so you get a base that holds without over-building it.
- Step : 02
Build the base and set it level
We compact a stone base so the pad has something solid to sit on, then form and pour it dead level. On Upstate clay that base is what stops the settling that leaves a pad tilted a year later.
- Step : 03
Reinforce, pour, and finish
Pads carrying real weight get rebar and a thicker edge; lighter pads get wire mesh. We place a 4000 PSI mix, finish the surface, and cut or tool the edges so the pad drains and wears clean.
What we need to know before we pour your pad
A pad goes in faster and comes out right when we have a few details up front. None of it has to be exact before you call.
- Step : 01
What sits on it
The make and footprint of the AC unit, generator, or spa. That tells us how big the pad has to be and how thick to pour it for the load.
- Step : 02
Where it goes
How our truck reaches the spot and which way the ground falls, so we can slope the pad to send water off it and away from the house or building.
- Step : 03
What runs underneath
Any lines, conduit, or utilities near the spot, so nothing gets poured over that should stay reachable later.
We confirm all of this on-site at the free estimate, so a rough idea is enough to get started.
Pouring garage and building slabs
A building slab from forms to finish: perimeter set, reinforcement placed, concrete placed and screeded, then floated and finished flat.
See why Greenville and Upstate, SC residents choose us
Ace concrete was excellent. They did a wonderful job. Very great experience with the workers and was very surprised that the owner showed up at the job and he actually did smoothing of…Google review
Ace Concrete did an amazing job with our patio addition. I was able to get a quote quickly, and they even completed the job one day after receiving my quote! I had quotes from other…Google review
Ace knocked it out the park for me on a large concrete driveway pour in Taylors, SC. From the initial estimate with Jason to the onsite coordination with Tyler, Ace was extremely…Google review
Great job, the pad for our generator is perfect I highly recommendGoogle review
I needed a 24' x 40' concrete floor for a metal building. After getting several quotes I decided to go with Ace Concrete Construction. I had met with Will Murphy and immediately felt like…Google review
Great work team was finished in a day and all the areas look great.Google review
5 Things to Check Before Pouring a Commercial Slab or Parking Pad in Greenville County
Planning a commercial slab or parking pad in Greenville County? Five things to check first: load, base, drainage, joints and permits. Free site visits.
Read itSeptember 7, 2026Why Fall Is the Best Window to Pour Concrete in Upstate South Carolina
Mild days, fewer storms and settled red clay make September and October the Upstate's best pouring months. What to schedule now, from the Ace Concrete crew in Taylors SC.
Read itSeptember 9, 2026Cracked, Lifted, or Crumbling: When to Repair a Concrete Sidewalk in Greenville and When to Replace It
Cracked, lifted, or crumbling concrete walkway or steps in Greenville? How to tell a repair from a replacement, why Upstate walks fail early, and the honest fix. Free estimates.
Read itWho Ace Concrete Construction is, where it works, and under what licence
Where Ace Concrete works
Get your free concrete estimate
We price the job on site. Open Mon–Sun 7am–7pm.
Tell us about the job
Someone comes out and prices it standing on it. Estimates are free.
- Driveways, slabs, patios and walks
- Foundations and retaining walls
- Commercial and industrial pours
- Demo and repair
Fast & Free
Get Your Free Concrete Estimate





